Where crowds gather …

… the demand for smooth operations and safety is particularly high. Unique requirements regarding the electrical infrastructure in highly complicated environments can only be fulfilled by an experienced specialist provider like the NIEDAX GROUP. This is why our products can be found in almost all public buildings: from stadiums and sports arenas to hospitals and administrative buildings.

Selected projects

Parking garage Singen

Project description

On 4th of November 2014, the new parking garage at the clinical center in Singen went into operation as planned. In the bright and spacious parking garage are now 345 parking lots on eight parking levels available. Besides two staircases, an elevator makes the new parking garage accessible. A special feature of the new parking garage is the continuous and energy saving LED-lighting. Niedax delivered for this purpose an individual special solution, consisting of approximately 4.000 meter cable trays and the related cable support clamps with directly integrated light technology.

 

Porsche Arena

Project description

The NIEDAX GROUP produced 3,000 hot-dip galvanised trays for the Porsche Arena in Stuttgart, the largest event hall in South Germany. They make it possible to create special constructions, are very resistant to corrosion and are incredibly safe in every way. This is with regard to both fire protection, so that electrical systems which are relevant to safety function for as long as possible, but also with regard to vandalism.

THE ELBE PHILHARMONIC HALL

 
Project description

The cable support system for the prestigious Elbe Philharmonic Hall in Hamburg, which is still under construction, has already been installed. In order to meet the many and various functional requirements for the concert hall, NIEDAX GROUP has supplied an extraordinary variety of products thus far, including 9,100 m of hot-drip galvanised cable trays and 4,500 m of functional integrity trays.

Nürburgring

Project description

When the pit lane, paddock and VIP/press area at the Nürburgring, the longest permanent race track in the world, were being rebuilt, NIEDAX was involved not only as a supplier but also as a source of ideas. Just for these three areas of the Ring, the company supplied 3,500 m of cable trays as well as the colossal amount of 25,000 bolt clamps. The latter were an innovation from Niedax and have been manufactured by the company for 60 years.

NUREMBERG TRADE FAIR

Project description

Exhibition hall 3a, newly opened in Nuremberg in 2014, covers an area of more than 9,000 square metres and is considered to be an exceptional building, designed by the renowned and award-winning architecture firm, Zaha Hadid. NIEDAX GROUP's cable tray system here provided an important contribution to the smooth and safe running of trade fairs. With a great range of products - including 3,200 m of unperforated wide-span cable tray and 3,500 m of other cable trays - a reliable data stream is ensured even during fully booked trade fairs.